Installing a Universal Corner Quickstart Kit in a Left-Turn Configuration
Download the PDF Instructions here!
Decide the height at which you would like your Universal Corner Quickstart Kit to be installed.
We recommend 82-84 inches in a typical scenario. However, your ceiling height or specific needs may vary. The Rhino Shelf must be mounted 26 inches below the ceiling to allow for the diagonal support to function correctly.
Once a height is established, mark that height on your wall. Then, locate the studs in your installation area.
Place the Left Wall Assembly against the wall on the left side of your installation area with the top of the bracket aligned with your level line. On the Left Wall Assembly, mark the stud locations and drive the included lag bolts through the Left Wall Assembly and into the center of the studs.
*Note: You may need to use your 1/4-inch drill bit to drill through the Left Wall Assembly. This is expected and will not affect the strength of the system.
If you are installing a 4'x4' Corner Quickstart Kit, your next step will be to mount a Right-End Assembly (discussed below in Finishing the Installation of the Base Unit). In most cases (those installing 8-feet and greater), the next step will be to mount a Tee Assembly.
Continuing the Installation of the Base Unit
Place the pre-assembled Tee Assembly onto the Tee Wall Bracket under the lower lag bolt. Notice that the Tee Assembly is temporarily held in place so that your hands are free. Using a 1/2-inch wrench and a 1/2-inch drive socket, attach the Tee Assembly to the Tee Wall Bracket with the included 5/16" bolts and nuts.
Place the pre-assembled Right-End Assembly onto the Right-Wall Bracket under the lower bolt, as before. Using the included bolt and nut, attach the Right-End Assembly to the Right Wall Bracket and tighten with the 1/2-inch wrench and drive socket.
Maintain level with the Right End Assembly and attach the upper diagonal arm, as before.
When installed, the Right End Assembly will look like this:
At the wall, measure the distance between the vertical portion of each assembly. Cut your 2x4s and begin installing the boards at the front of each section. Keep your front 2x4s as flush as possible with the front of the assembly. The Rhino Shelf has 5 boards per bay.
Connecting the Corner QuickTurn Connector
Place the Corner QuickTurn Connector on top of the front board of the Base Unit. Choose the bay that is closest to the wall. Be sure that the holes in the Quickstart System are closest to the wall.
Drill pilot holes in the holes that correspond to your Right Wall Assembly. Attach the Right Wall Assembly to the QuickTurn System using 2 of the included lag bolts.
From this point, installing the Return Unit of the Corner Quickstart Kit is very similar to the installation of the Base Unit.
Find the stud that is closest to 48 inches from the QuickTurn Connector and Right Wall Assembly. If you are installing the 4'x4' Corner Quickstart Kit, you will install a Left-End Assembly (see Finishing the Installation of the Return Unit below). For 8'x8' and 12'x12' installations, you will install a Tee Assembly exactly as before.
Continuing the Installation of the Return Unit
Install a Tee Assembly on the stud that is closest to 48 inches from the Corner QuickTurn Connector and Right Wall Assembly.
First, install the Tee Wall Bracket.
(Note: The holes in your Tee Wall Bracket may appear different than those in this video. This is not a concern as your included Tee Wall Bracket will function properly with the holes that you have.)
Then, attach the pre-assembled Tee Assembly to the Tee Wall Bracket using 2 of the included bolts and nuts, exactly as before.
Place the 2' level vertically against the wall and perfectly aligned with the 2 lag bolts on your Tee Wall Bracket. Make a mark from the top of the level down 2 inches. This line is the center of a stud and will provide guidance when installing the upper diagonal arm.
Place the 2' level on on the Tee Assembly horizontally and maneuver the upper diagonal arm to make contact with the wall. The placement of the diagonal wall bracket should be determined by making sure that the Tee Assembly is level.
Maintain level with the Tee assembly and attach the upper diagonal to the wall, exactly as before.
Finishing the Installation of the Return Unit
Attach the pre-assembled a Left-End Assembly to the Left Wall Bracket with a single bolt and nut.
Maintain level and attach the upper diagonal arm, as before.
When the installation of the Left-End Assembly is complete, it will look like this:
The installation of the Return Unit is nearly complete. Add shelf decking in exactly the same way as before.
Congratulations! The installation of your Universal Corner Quickstart Kit is now complete!